Core Competancy

core COMPETANCY


Track Laying

Ballasted Track
New Construction
︎2nd Line
3rd Line

Ballast Less Track (BLT)
Washing Line
Tunnels
Metros

Track Renewal

Complete Track Renewal (CTR)
Through Rail Renewal (TRR)
Through Sleeper Renewal (TSR)

Mechanised Track Maintenance

Deep Screening
Temping
Ballast Profiling

Flash Butt Welding

Depot Welding
In-situ Welding
Long Weld Panels
Closure Welding

CMS Reconditioning

In-situ Reconditioning of CMS Xings by Robotic Welding Machine under Speed Restrictions or Traffic Blocks with the extended life of 80 GMT.

USFD Testings

USFD Testing of Rails by A & B Scan technology
USFD Tedting of Welds by A Scan technology

Steel Fabrication

︎Foot Over Bridges
Girder Bridges

Yard Remodeling

Extension of Existing Track
Extension of Loop Lines
Turnouts Replacement
All Civil & Allied Works

Turnkey Works

EPC Projects
Schedule Based Project

Transportation

︎Rail Transportation
Line & Special Sleeper Transportation
Track Fittings
Ballast Transportation

© Copyright 2021 Railtech Infraventure Private Limited